Cost calculation

Material total
₹45,001.60
Labour
₹57,000.00
Installation
₹15,000.00
Transportationadded to direct cost
₹7,000.00
Other expenses
₹4,000.00
Project direct costmaterial + labour + installation + transport + other
₹1,28,001.60
Overhead10% of direct cost
₹12,800.16
Profit15% of (direct + overhead)
₹21,120.26
Pre-tax total
₹1,61,922.02
GST18% of pre-tax total
₹29,145.96
Final project estimate
₹1,91,067.98

Percentages come from the project (edit them on the Summary tab). Material rates are read live from Material Management.

Add labour or expense

Labour & other expenses

CategoryDescriptionUnitRate (₹)QtyAmount
Labour ₹45,600.00
Labour ₹11,400.00
Installation ₹15,000.00
Transportation ₹7,000.00
Other Expenses ₹4,000.00

Item-wise cost breakdown

ItemQuantityRateAmount
Plywood & boards₹26,800.00
Commercial Plywood 18mm · Greenply6 Sheet₹2,150.00₹12,900.00
MDF 6mm · Greenpanel3 Sheet₹780.00₹2,340.00
BWR Plywood 18mm (8×4) · Century4 Sheet₹2,890.00₹11,560.00
Laminate₹6,510.00
Laminate 1mm Walnut Woodgrain · Merino2 Sheet₹1,450.00₹2,900.00
Laminate 0.8mm Matt White · Greenlam2 Sheet₹1,180.00₹2,360.00
Laminate 1mm Slate Grey (7×4) · Century1 Sheet₹1,250.00₹1,250.00
Edge banding₹2,926.00
PVC Edge Band 2mm · Rehau209 Running Feet₹14.00₹2,926.00
Hardware₹8,765.60
Shutter hinges (Soft-close Hinge · Hettich)19 Piece₹185.00₹3,515.00
Handles (Steel Handle 8 inch · Ebco)9 Piece₹220.00₹1,980.00
Drawer channels (Telescopic Channel 18 inch · Hafele)4 Set₹340.00₹1,360.00
Screws (Wood Screws 1.5 inch (box) · Fischer)4 Set₹120.00₹480.00
Hanging rod (Aluminium Wardrobe Rod · Ebco)12.36 Running Feet₹85.00₹1,050.60
Wardrobe lock (Wardrobe Lock · Godrej)1 Piece₹380.00₹380.00
Labour₹57,000.00
Carpentry – fabrication480 Square Feet₹95.00₹45,600.00
Laminate pasting & finishing300 Square Feet₹38.00₹11,400.00
Installation₹15,000.00
On-site installation crew6 Day₹2,500.00₹15,000.00
Transportation₹7,000.00
Material transport (tempo)2 Trip₹3,500.00₹7,000.00
Other Expenses₹4,000.00
Site cleaning & consumables1 Lump sum₹4,000.00₹4,000.00